The first quarter of 2025 has been very successful thanks to our generous donors:
What we have already accomplished.
In phase 1, with your donations 3 new gym exercise machine have arrived at the school gym. They are all made in the USA. An elliptical, a rowing machine and a spinning stationary bike. The old machines were decades old and constantly in need of repair.
What still needs to be done?
Phase 2 brings our attention to the old gym flooring, which is uneven and unsafe. A soft, safe new floor will make it possible to run, jump and wrestle without injury.
Phase 3 will replace the old gym’s air conditioner, which is not working and needs to be replaced. In the summer, the conditions inside the gym are almost unbearable for the students. SUT is working with the Grizzly Gym’s administration to get the best quality replacements for the lowest price. Then a timeline will be determined to accomplish these improvements.
Meanwhile, please keep those donations coming so we can commence phase 2 and hopefully move on to phase 3 as the very hot Ukrainian summer approaches.